Worked cable tray rise examples

Choose a geometry close to your measurements. These cases compare ideal base-edge geometry, not material bend allowances. Every row opens a complete example with its own numbers and calculator.

Rise / angleTray sectionSloped lengthHorizontal reach
100 mm / 30°100 × 50 mm200.00 mm173.21 mm
150 mm / 30°200 × 50 mm300.00 mm259.81 mm
200 mm / 30°200 × 50 mm400.00 mm346.41 mm
300 mm / 30°300 × 100 mm600.00 mm519.62 mm
150 mm / 45°200 × 50 mm212.13 mm150.00 mm
200 mm / 45°300 × 100 mm282.84 mm200.00 mm
300 mm / 45°400 × 100 mm424.26 mm300.00 mm
100 mm / 60°150 × 50 mm115.47 mm57.74 mm
200 mm / 60°200 × 75 mm230.94 mm115.47 mm
300 mm / 60°300 × 100 mm346.41 mm173.21 mm
150 mm / 15°200 × 50 mm579.56 mm559.81 mm
300 mm / 15°400 × 150 mm1159.11 mm1119.62 mm

What changes between the cases?

At the same rise, a steeper angle shortens the slope and its horizontal reach. Side height changes the V-notch; base width changes the channel cross-section but does not change the ideal rise triangle. Use each page’s stated horizontal run to understand its lead-in.

Open the general vertical offset calculator ↗