Cable Tray Below a Beam with Side-Wall Clearance
Calculate a four-fold cable tray route below a beam. Include beam underside, clearance and tray side height, then inspect stock stations and the editable 3D route.
Inspect the 3D example ↗Reference the underside to the incoming base
This route descends below a hanging beam, passes beneath it and rises back to the incoming tray level. Measure the beam underside as a positive downward distance from the incoming base plane. Measure beam length along the route. Enter the clearance above the highest part of the tray side wall.
The example places the beam underside 150 mm below the incoming base. Clearance is 50 mm and tray side height is 50 mm. The lower base must drop by 150 + 50 + 50 = 250 mm. At that level the wall top is 200 mm below the incoming base, giving the requested 50 mm gap below the beam.
Use a 200 mm wide tray, 400 mm beam length, 45° slopes and 350 mm lead and tail. Side height is part of this vertical clearance calculation. Locate both wall tops in the formed side view before transferring the dimensions to material.
Calculate both slopes and the lower middle section
For base-level drop R and slope angle θ, each sloped base length is S = R / sin θ and its horizontal projection is Q = R / tan θ. With R = 250 mm and θ = 45°, S = 353.55 mm and Q = 250 mm. Both diagonal base sections have the same length.
The lower middle axis spacing is P = O + 2[c + h tan(θ/2)], using beam length O, clearance c and wall height h. Here P = 400 + 2[50 + 50 tan 22.5°] = 541.42 mm. The lead, two slopes, middle and tail add to 1948.53 mm of straight stock.
Worked example dimensions
| Measurement | Value |
|---|---|
| Underside below the incoming base | 150 mm |
| Clearance above the tray wall | 50 mm |
| Tray side height | 50 mm |
| Required base-level drop | 250 mm |
| Each sloped base length | 353.55 mm |
| Lower middle fold-axis spacing | 541.42 mm |
| Closing V width / formed opening gap | 41.42 mm / 38.27 mm |
| Total straight stock | 1,948.53 mm |
Inspect the opening and closing joint pairs
The stock stations are 350, 703.55, 1244.97 and 1598.53 mm, with turn sequence −45°, +45°, +45°, −45°. Folds 1 and 4 open side-wall slits during forming. Folds 2 and 3 close side-wall V cuts. Preserve the base connections shown at all four joints.
At the closing pair the full V width is 2h tan(θ/2) = 41.42 mm. At the opening pair the fully formed wall-top gap is 2h sin(θ/2) = 38.27 mm. Follow Original, Mark, Cut and Form to read each measurement at its corresponding stage, then check the complete wall profile below the beam.
Review the fabrication detail
The route uses ideal sharp folds. Check the actual profile, lips, material allowances, joint covers and the space required by the cable path against the product instructions and site dimensions.
Continue with a related layout
Cable Tray Bridge Over an Obstacle — Worked Layout ↗
Centered Cable Tray Reducer — Panel Lengths and Assembly ↗
Cable Tray Column Bypass with Width and Clearance ↗
One-Sided Cable Tray Reducer with One Edge Aligned ↗
Cable Tray Through a Wall Opening with Clearance ↗
Horizontal Cable Tray S Offset and Stock-Axis Spacing ↗
Cable Tray U Return with Four 45 Degree Folds ↗
Cable Tray 90 Degree Turn with Three 30 Degree Folds ↗
Cable Tray 90 Degree Turn with Four 22.5 Degree Folds ↗